Ok.
There are no resource groups in S&OP/Supply (yet). The text is meant as an example. E.g. you have 2 resources of capacity 100 which build a group. Then you can specify an aggregated constraint over all production sources on these 2 resources with a maximum of 150.
=> only 150 of the capacities will be consumed in total
Regards, Carsten